AECOM: Quantity Surveying Lead (PMC) — Ahmedabad, GJ, India

AECOM lists a Quantity Surveying Lead (PMC) opening in Ahmedabad, GJ, India. The position is listed as intern. The job description covers Excel, audit, compliance, procurement, sustainability, stakeholder management, tender management.

Recruitment overview

OrganisationAECOM
Post / roleQuantity Surveying Lead (PMC)
Employment typeIntern
Notification / job IDREF59089Y
Job locationAhmedabad, GJ, India
Work arrangementOn-site
Educational qualificationDegree / qualification: Bachelor’s Degree in Civil Engineering / Quantity Surveying / Construction Management
Experience required12+ years of experience in quantity surveying and cost management for large infrastructure/energy projects
Salary / stipendSee employer notice for pay details
Last date to applySee official notice

About AECOM

AECOM is an infrastructure consulting business whose employer material describes work involving transport, energy, water and the built environment. Its activities bring together planning, design, engineering, scientific work, and programme or construction management. The organisation's described projects concern the physical systems used by communities, from travel and utilities to buildings. Those activities connect technical disciplines with project delivery, supported by digital and business functions around the planning, development and management of infrastructure.

The position and its setting

AECOM lists Quantity Surveying Lead (PMC) in Ahmedabad, GJ, India, under reference REF59089Y. The details below separate the work described by the employer from essential conditions, preferred experience and practical preparation advice.

  • Employment type: Intern
  • Employer listing date: 28 April 2026
  • Legal Entity: AECOM India Private Limited
  • Job Family: Estimation
  • Brands: AECOM

Responsibilities and work described

  • Role Purpose
  • The role ensures cost optimization, contractual compliance, risk mitigation, and financial transparency across all project phases—from feasibility and design through procurement, construction, and final close-out—while acting as the owner’s commercial representative
  • 1
  • Cost Planning & Estimation
  • Development: comprehensive cost plans and budgets across all stages: concept, feasibility, preliminary, and detailed design
  • Preparation: benchmarking models using historical data, BCIS, SoR, and international cost indices
  • Leadership: life cycle cost (LCC) and carbon cost assessments for sustainable infrastructure planning
  • Quality / delivery: cost alignment with project phasing strategies and GW-scale capacity build-outs
  • 2
  • BOQ, Quantity Take-Off & Tendering
  • Preparation: and validate Bills of Quantities (BOQs) in line with NRM, CESMM, and MCHW standards
  • Execution: detailed quantity take-offs for EHV transmission lines, Switchyards/substations, and renewable systems (Solar, Wind, & BESS)
  • Support: preparation of tender documents, pricing schedules, and bid evaluation frameworks
  • Quality / delivery: BOQ alignment with design drawings, specifications, and execution methodology
  • 3
  • Cost Control & Financial Monitoring

Essential requirements and candidate background

  • Bachelor’s Degree in Civil Engineering / Quantity Surveying / Construction Management
  • 12+ years of experience in quantity surveying and cost management for large infrastructure/energy projects

Education and qualification routes

  • Degree / qualification: Master’s Degree (preferred) in relevant discipline

Preferred experience and additional strengths

  • Experience: Indian infrastructure projects is preferred
  • MRICS (or working towards certification) is highly desirable

Location, schedule and contract conditions

  • Administer contracts under NEC, FIDIC, and JCT frameworks
  • Manage:
  • Variation Orders (VOs)
  • Change Requests
  • Claims and EOT evaluations
  • Ensure contractual compliance, commercial protection, and risk mitigation
  • Maintain contract registers, claims logs, and change trackers
  • 6
  • Procurement & Commercial Strategy
  • Develop and implement procurement strategies aligned with project timelines and cost objectives
  • Support vendor prequalification, bid evaluation, and contract award recommendations
  • Optimize procurement through package strategy, bulk procurement, and cost leverage mechanisms
  • 7
  • Project Controls & Reporting

Employer details to confirm

  • The employer’s seniority category and its stated experience requirements do not agree. Follow the role-specific requirements above rather than assuming this is a fresher opening.

Conditions requiring the complete notice

Some passages contain complex or combined conditions that have not been reduced to short eligibility statements here. Read the complete linked notice for those passages, including any alternatives, exceptions or restrictions. The concise facts above should not be treated as the full wording of every condition.

Pay and application dates

A verified salary figure is not established in this article. An online estimate for another Quantity Surveying Lead (PMC) vacancy is not an offer for reference REF59089Y; use the employer’s own pay disclosure and recruitment communication.

A closing date is not confirmed in this article. Check the current employer page before submitting: an undated posting can change or be withdrawn.

How to apply to AECOM

Applications follow the official employer page linked below.

Open the official AECOM posting below and match the title and reference REF59089Y.

Compare your qualifications and experience with the essential conditions for the Ahmedabad, GJ, India position, then read the preferred criteria separately.

Prepare an accurate CV and the supporting items requested in that employer’s application. Provide only information and documents you are authorised to share.

Use the employer’s application option, complete the required fields and review the submission. Retain the acknowledgement when one is provided. Job Alerts World does not receive the application.

Practical preparation: Excel

Excel examples should identify the task, the data and the checks used to avoid an incorrect result. Explain whether you built a reporting workbook, reconciled records, automated a process or maintained an existing model.

Relevant skills

  • Excel
  • PowerPoint
  • audit
  • compliance
  • procurement
  • sustainability
  • stakeholder management
  • tender management
  • transmission infrastructure
  • civil engineering
  • surveying

Important links

Official notification / job descriptionOpen official page
Online application portalOpen official page

Read the complete official notice before applying. Availability and requirements can change.

For corrections, see our editorial policy and contact information.